Drainage and Highways
SCHEME
Adhoc Drainage and Highways Term Maintenance Contract
CLIENT
Thurrock Borough Council
LOCATION
Thurrock, Essex
VALUE
-
DURATION
2008-2014
The school needed new more effective car parking space to ease the car parking in the residential streets. The car park also needed to be built within the summer break time frame, with the design factoring the special needs of the school.
Project description: Henderson & Taylor, used our Early Contractor involvment to design and build the car park and surrounding footpaths and roads to improve the flow of traffic and parking availability for Castedon school. The project was completed in budget and on time for the school to re-open in September with the new car park, roads and footpaths in place.
Henderson and Taylor, have been appointed by Thurrock Borough Council to maintain all of the Highways, Footpaths, Drainage schemes and Infrastructure Network in general. This requires that we respond to the Thurrock’s Highways engineers instructions pertaining to all drainage, footpath and highway maintenance problems, rapidly identifying solutions to whatever problem has arisen. This has ranged from a collapsed drain to excavating a carriageway and replacing failed road construction. We also construct new drainage schemes, footpaths and highway sections.
Services Provided
- Highway, Footpath, Drainage Maintenance
- Earthworks (inc embankment, footpath & road construction)
- Groundworks
- Reinforced Earth Solutions
- Drainage, storm drains, fowl drains, catch pits, manholes, duct installation (all sizes), depths vary from 0.5m to 5m.
- Specialist Trench support systems
- Kerb laying (Inc, Bus Stop kerbs, high retainment kerbs,edging kerbs)
- Block paving
- Concrete slab paving (Inc, Tactile paving)
Benefits to Customer
- Multi skilled workforce capable of carrying out every aspect of Footpath and Highway Construction as a single organisation
- Reliable and dedicated workforce
- In house traffic management, allows any scheme to be taken from conception to completion, minimising project complications
- A system of maximised communication between all parties